Success story 02 · Green hydrogen · ABB, 2022–2026
Eyes on the Target: building a hydrogen business at ABB while the industry went through a storm
The market grew far more slowly than anyone expected. What I built along the way, from product and portfolio to tools, solutions and people, did not depend on it.
My role: from R&D technical lead for Unirec H2 to Global Customer Solution Manager in a start-up-like hydrogen team at ABB Motion High Power.
4 yearsfrom R&D to global technical sales
~750 MWlargest opportunities I led technically
2 + 4core roles, plus China ramp-up, R&D, PM and front-end sales
Nominatedfor ABB’s leadership career path
Choose your version
The challenge
In 2022 green hydrogen looked ready to move from pilot plants to industrial scale. ABB had strong power-conversion platforms that could feed electrolyzers, such as the DCS880 and ACS880, but no dedicated hydrogen portfolio, no hydrogen references, no established processes and no customer base. I joined at the very beginning: first as R&D technical lead for Unirec H2, then, from mid-2023, in a newly formed hydrogen team in Motion High Power that worked like a start-up inside a global company.
What I did
Wherever the team had a capability gap, I moved towards it and helped close it:
Product: took Unirec H2 from requirements to hardware, software, digital twins and a sales configurator.
Portfolio: helped turn existing drives and rectifiers, and later the new PCI880, into hydrogen power-supply solutions.
Engineering: built simulation, sizing and grid-compliance methods for harmonics and power factor.
Sales: led technical sales, tenders and full-cost models for projects up to about 750 MW.
People: trained the team in ABB China and transferred the know-how so they could take over the new product and larger packages.
The result
An honest outcome. The hydrogen market grew much more slowly than the industry expected in 2022. Many large projects were delayed or cancelled worldwide, and the orders never reached the original ambition.
The capabilities, however, proved themselves. The same simulation methods helped the 10 MW REDDAP Power-to-Ammonia plant obtain grid approval and start production (Success story 01). ABB’s written reference describes my “agility and initiative in a start-up-like environment”, and I was nominated for ABB’s leadership career path and completed the DDI Talent Development Assessment.
What it shows
Building in uncertainty: creating products, processes and solutions where none existed.
Versatility: covering every role the team needed, not only the one on my business card.
Scaling through others: moving from doing the work myself to enabling other teams to do it.
Credibility: keeping the results visible, including the parts the market did not deliver.
Success stories are usually measured in orders. This one cannot be, and I do not want to pretend otherwise. Green hydrogen did not become the commercial success the whole industry hoped for in 2022. But four years in a new business taught me more about leadership than any finished project: how to build something when the product, the market and even your own role are still being defined.
2022: starting from a blank page
I came from a mature world: EPC power plants, and then excitation, synchronizing and static starting systems at ABB, where decades of installed base tell you what customers need. Hydrogen had none of that. There was no application handbook and no stable set of customer requirements. We had to work out what the product itself should become.
As Product Specialist and R&D Technical Lead for Unirec H2, ABB’s new power-converter system for electrolysis, I worked from the requirements through hardware and software. I helped define the roadmap and specifications, built digital twins to verify them, led the hardware and software of a small-scale test simulator for new control functions, created a sales configuration tool, and led a remote application-engineering team in China. The lesson came early: in a new market, product development cannot be separated from application knowledge and customer requirements.
2023: a start-up inside a global company
In June 2023 I moved into the new hydrogen team in Motion High Power. The question became much bigger than one product: how can ABB build a credible hydrogen power-supply business from technologies it already has? The platforms existed. What was missing was everything around them: hydrogen-specific architectures, sizing methods, simulations, documentation, tender processes, cost models, customer messages and references.
Playing every position the team needed
My title was Global Customer Solution Manager. In practice, a small team in a new market needs people who go where the gaps are. Depending on the week, I worked as:
customer solution engineer and solution architect for power-supply packages;
technical sales lead in customer meetings and tenders;
simulation and application engineer for grid compliance;
author of technical and commercial offers and full-cost models;
support for R&D, project management, procurement and manufacturing;
a global reference for regional sales teams on hydrogen topics;
trainer and technical lead of the know-how transfer to ABB China.
“He has successfully balanced two core roles, Sales Support and Simulations Application Engineering, while also supporting the China team’s ramp-up, contributing to R&D and PM, and assisting in front-end sales.”
ABB interim reference letter, Hydrogen, 2025 · read the letter
Building the machinery behind the proposition
Selling a power supply for an electrolysis plant is not selling a catalogue item. Transformer, converter topology, DC operating range, harmonics, power factor, cooling, packaging and the grid code all interact. So we moved the conversation from “here is an ABB rectifier” to “here is an engineered power-supply solution for your electrolyzer and your plant”.
To make that repeatable, a large part of my work happened behind the customer meetings: sizing and calculation tools, simulation models, a sales configurator, offer templates, technical descriptions and training material for colleagues. None of this appears in an order book. But without it, a new business cannot respond when the opportunities arrive.
Scaling through others: ABB China
The clearest leadership step was China. The goal was for the local team to take technical and, step by step, commercial responsibility for more complex packages: not only a rectifier, but rectifier, transformer, e-house and grid-side compensation together, and the new PCI880. I prepared and ran the know-how transfer: hydrogen products, complete power-supply systems, live project cases, simulations, engineering and sales tools, full-cost modelling and supplier interfaces. My role changed from delivering the work myself to building the capability of another organization to deliver it. To me, that is what leadership looks like in practice.
When the work met reality
The strongest proof that the capabilities were real came from REDDAP in Denmark, the world’s first dynamic Power-to-Ammonia plant. Its grid approval depended on a rectifier grid-model package that did not exist as a standard deliverable. Using the simulation methods we had built, I led a small team that broke the request into solvable steps. The grid operator accepted the package, and the plant delivered its first green ammonia in December 2025. The full case is described in Success story 01.
In tenders, the same discipline mattered when ABB was not the obvious winner. When a competitor was cheaper or more compact, I did not answer with marketing claims. I looked for differences that mattered to the customer, such as reactive-power capability and grid performance, and backed them with calculations and simulations, sometimes proposing a different electrical architecture so the customer’s KPIs could be met.
Recognition
Over these years, the way ABB assessed me went beyond engineering. The interim reference describes strategic, analytical and networked thinking, independent initiative, resilience and customer orientation, and it also describes how I lead people:
“Mr. Tsimplidis recognizes his staff’s potential, encourages and develops them successfully according to their capabilities, and points out specific development options.”
ABB interim reference letter, Hydrogen, 2025
In the same period I was formally nominated for ABB’s leadership career path and completed the DDI Talent Development Assessment.
The outcome, honestly
The market did not follow the plan. Large projects were delayed, cancelled or failed to reach investment decisions across the industry, and ABB’s hydrogen activities became part of a wider Renewables business, where I extended my scope to Solar PV and battery storage.
No engineer or sales team can create a market that does not arrive on schedule. What a team can control is whether it builds the right capabilities, supports customers well, learns fast and leaves the organization stronger than it found it. That is how I would like this chapter to be judged.
Leadership takeaway
Hydrogen taught me how to build inside uncertainty. The commercial thesis changed; the capabilities and the leadership experience did not. I developed products when products were missing, tools when engineering capability was missing, and solutions and documents when sales infrastructure was missing. And as the organization matured, I passed those capabilities on to other people and regions instead of keeping them to myself.
The engineering problem
An electrolyzer is a large, low-voltage, high-current DC load, often fed from weak or renewable-dominated grids. Its power supply is therefore an electrical system, not a single product. A credible offer has to solve, at the same time:
the DC operating envelope: stack voltage and current from beginning to end of life, with overload margins;
converter topology and transformer design (vector groups, pulse number, impedance);
harmonic emissions and power factor at the point of common coupling, against the grid code;
reactive-power compensation and filters, and the plant’s dynamic behaviour with variable renewables;
efficiency, cooling, busbars, footprint and containerized packaging;
cost: the full package, not only the converter.
Product layer: Unirec H2 (2022–2023)
As R&D technical lead I worked on ABB’s new power-converter system for electrolysis from requirements to hardware and software:
product roadmap, specifications and technical requirements together with Product Management;
digital twins in MATLAB/Simulink and PLECS to verify specifications and to simulate the product for sales;
hardware and software lead for a small-scale test simulator to develop and validate special control functions;
a sales configuration tool for solution design and component dimensioning, with component specifications aligned with suppliers;
leading a remote application-engineering and system-design team in China.
Platform layer: from drives to hydrogen solutions (2023–2026)
In Motion High Power the task was to turn existing platforms into hydrogen propositions, and to position new ones early. In simplified terms, the trade-offs we had to explain to customers were:
Option
Strengths
What has to be engineered around it
Thyristor rectifier (e.g. DCS880-based, 12-pulse)
proven, robust, efficient, cost-effective at high current
load-dependent power factor and characteristic harmonics: compensation, filters and transformer design
IGBT active front end (e.g. ACS880-based)
near-unity power factor, low harmonics, reactive-power capability
higher cost and losses, cooling and footprint
Dedicated IGBT power converter (PCI880)
designed for electrolysis, grid support, compact packaging
new product: operating-envelope checks for each electrolyzer, early references
The right answer depended on the grid, the electrolyzer technology and the customer’s economics. Showing that we understood these trade-offs, rather than pushing one product, became a large part of ABB’s value proposition.
Engineering capability I built
GRID COMPLIANCE
Harmonic and power-factor simulations at rectifier and plant level in MATLAB/Simulink, PLECS, DIgSILENT PowerFactory and PSCAD, supporting customers towards grid authorities.
SIZING
Calculation tools that match converter and transformer ratings to the electrolyzer polarization curve, including end-of-life voltage and overload margins.
SOLUTION ARCHITECTURE
Power-supply packages: transformers, converters, busbar systems and containerized plug-and-play solutions.
OFFERS & COST
Technical descriptions, offer templates and full-cost models for opportunities up to about 750 MW.
Technical sales in practice
Three anonymized examples show how the engineering was used in front of customers:
1. Positioning a new product early
For a roughly 150 MW electrolysis opportunity, I requested compatibility checks of the PCI880 against the electrolyzer’s operating envelope, including overload margins and the available reactive-power compensation, so that the new converter could enter the discussion before the customer’s architecture was fixed. A similar check with a leading electrolyzer manufacturer confirmed compatibility with its stack current and identified usable reactive compensation, which became a concrete selling argument.
2. Defending value with numbers, not claims
In one competitive tender ABB was more expensive and had a larger footprint. Instead of arguing about price, I escalated the customer’s power-factor question across product specialists, R&D and ABB China and proposed backing ABB’s reactive-power and grid-performance advantage with calculations and simulations that the customer could verify.
3. Changing the architecture to meet KPIs
In another case, the technical assessment led to a recommendation to split parallel electrolyzer stacks, so that an IGBT-based solution could meet the project KPIs, rather than simply accepting the original electrical design.
Know-how transfer to ABB China
To let the local team move from supplying a rectifier to handling rectifier, transformer, e-house and grid-side compensation as one package, I was asked to define the first competence matrix of the required skills. The workshop programme covered:
hydrogen products and complete power-supply systems;
active project cases and simulations;
engineering and sales tools, and full-cost modelling;
supplier interfaces, combined with supplier visits.
Field proof: REDDAP
At the 10 MW REDDAP plant in Denmark, harmonic and impedance methods from this toolbox became the rectifier grid-model package that the grid operator accepted with no open technical points, before the plant delivered its first green ammonia in December 2025. See Success story 01 for the full technical case.
Lessons that transfer
In a new market, application knowledge is part of the product.
Solve the electrical system, not the component: grid, transformer, converter and load together.
Make every claim demonstrable with a calculation or a simulation.
Tools, templates and training are what allow a small team to scale.
Know where your solution is weaker, and where it is stronger in ways that matter economically.
Context. The hydrogen market developed far more slowly than expected, and the commercial volume did not reach the original ambition. The engineering methods described here carry over directly to the Solar PV, battery-storage and grid-integration work I do today.
Customer, partner and project details are anonymized or limited to publicly available information. Confidential data, internal documents and correspondence are not shown. Market context reflects public industry sources.